| M-A1 CNC Lathe | Line A | | 10h | ⚠ Peak | → Move to off-peak: Non-time-critical batch — can run night shift | ฿31,233 | ✓ Flexible | |
| M-A2 Assembly | Line A | | 8h | ⚠ Peak | Keep as-is: Customer-required daytime delivery | — | Fixed | |
| M-B1 Press | Line B | | 9h | ⚠ Peak | → Move to off-peak: Product Y-200 — buffer stock allows night run | ฿37,727 | ✓ Flexible | |
| M-B2 Welder | Line B | | 10h | ⚠ Peak | Keep as-is: Requires operator supervision, daytime only | — | Fixed | |
| M-B3 Inspection | Line B | | 6h | ⚠ Peak | → Move to off-peak: Automated inspection — no operator needed | ฿3,945 | ✓ Flexible | |
| M-C1 CNC Lathe | Line C | | 10h | ⚠ Peak | → Move to off-peak: Z-050 batch — 3-day lead time, can shift | ฿27,946 | ✓ Flexible | |
| M-C2 Packaging | Line C | | 8h | ⚠ Peak | Keep as-is: Final packaging must align with dispatch schedule | — | Fixed | |
| Compressor | Utility | | 12h | ⚠ Peak | → Move to off-peak: Pre-charge tanks during off-peak, reduce daytime run | ฿21,699 | ✓ Flexible | |
| Chiller unit | Utility | | 16h | ⚠ Peak | → Move to off-peak: Pre-cool during off-peak hours, reduce peak load | ฿38,828 | ✓ Flexible | |